We are the main fire prevention and suppresion works contractor for the supply, design, implementation, commisioning and hand over to client's operations for ;


  • 22 Zones of water based sprinkler systems

  • Underground Hydrant lines and hose reel cabinets

  • 2500 GPM Diesel + Electrical Fire Pumps

  • CO2 based extinguishing systems for various utilities

  • NOVEC based extinguishing systems for data center and UPS rooms

on EPC basis. The project was succesfully completed and handed over the our client's field operations team in 2017. Total land plot for the production factory is approximately 200.000 m2, and the construction area is 75.000 m2 (ie. factory areas)