Data Center Air-to-Air Cooling (20 x 150 kW) Project Completed

Writer's picture: Okan SaçlıOkan Saçlı

Updated: Jan 7, 2021

The project for the installation, commisioning and heat load testing for 20 nos. of 150 kW air-to-air cooling system (total of 3 MW cooling) has been successfully completed. The project is located in Ankara, Turkey in Kredi Kayıt Bürosu Tier4 datacenter. Palmet Engineering was the main contractor on an EPC basis of the complete phase-I of this huge datacenter complex. In phase one we have already installed 20 nos. of 150 kW cooling system for white space 1 and whitespace 2. This project was for whitespaces 3 and 4 respectively paralel to the expansion of KKB’s (Kredi Kayıt Bürosu) customers. The cooling units were manufactured by #flaktgroup in #Turkey

Both white spaces were tested under full IT heat load according to N+4 configuration and according to #Uptimeinstitute Tier-4 standarts and various failure scenarios.

After the successful completion of the systems, the cooling units are handed over to the data center operation teams.







69 views0 comments

Recent Posts

See All

Comments


@engineerslife by Okan Saçlı

Welcome to my website. I am an Istanbul based senior mechanical engineer with extensive know-how on datacenter technologies (design, certification, contruction and operation), power plants and privately building an Airbus A320 simulator at home. So please enjoy my website.

SUBSCRIBE 

Please subscribe to my website to receive updates from my Airbus A320 project, engineering projects and achivements and life in general

bottom of page