Natural Gas Fired CCGT Power Plant Project ALES

  • Writer: Okan Saçlı
    Okan Saçlı
  • Jan 29, 2019
  • 1 min read

Updated: Jan 7, 2021

This project is located in Aydın, Turkey. It was completed and commisioned in 2012. I was the acting project and construction manager for this 63 MWe Natural Gas Fired Combined Cycle power plant.


Some of the key figures and critical items are follows;


45.000 m2 landplot

GE LM-6000 PC Sprint NG Turbine + Generator

Aalborg Heat Recovery Steam Generator

GE Thermodyn 6-7 MC9 14.150 kW Steam Turbine + Generator

SPIG Water Cooling Tower

NG PRMS Station

11.5 kV / 154 kV Grid connection works

Water treatment plants (demineralized water productio plant + pre-filtration plant)

Raw Water / Fire Water Reservoirs

Water wells

Technical and Administrative Building

Plant SCADA and DCS Systems

Plant Fire Protection Systems

Overall plant Electromechanical Balance of Plant


 
 
 

Comments


@engineerslife by Okan Saçlı

Welcome to my website. I am an Istanbul based senior mechanical engineer with extensive know-how on datacenter technologies (design, certification, contruction and operation), power plants and privately building an Airbus A320 simulator at home. So please enjoy my website.

SUBSCRIBE 

Please subscribe to my website to receive updates from my Airbus A320 project, engineering projects and achivements and life in general

bottom of page